location:Home > 2023 Vol.6 Dec.N06 > Analysis on Safeguard Measures of High-standard Farmland Water Conservancy Project Construction in the Era of Big Data

2023 Vol.6 Dec.N06

  • Title: Analysis on Safeguard Measures of High-standard Farmland Water Conservancy Project Construction in the Era of Big Data
  • Name: Long Du
  • Company: School of Finance and Economics, Qinghai University,Xining 810001,China
  • Abstract:

    Water conservancy project has always been a key construction project in China, a big agricultural country. Under the long-term development, high-standard irrigation and water conservancy projects have become the top priority, and the safeguard measures of the projects are undoubtedly the key objects to be paid attention to. This paper puts forward the analysis of safeguard measures for the construction of high-standard farmland water conservancy projects in the era of big data. Firstly, the connotation of high-standard water conservancy project is explained, and then the function of safeguard measures for water conservancy project construction is explained. Finally, the safeguard measures for high-standard farmland water conservancy project construction are summarized and analyzed from three aspects: the problems of safeguard facilities construction, the measures to ensure water resources distribution and the sustainable development of safeguard measures.


  • Keyword: Farmland water conservancy project; Water conservancy security; Water conservancy construction; High standard farmland;
  • DOI: 10.12250/jpciams2023090803
  • Citation form: Long Du.Analysis on Safeguard Measures of High-standard Farmland Water Conservancy Project Construction in the Era of Big Data [J]. Computer Informatization and Mechanical System,2023,Vol.6,pp.10-15
Reference:

[1] Cheng D .Assessment system of water conservancy project impact on environmental pollution based on HSPF model[J].Desalination and Water Treatment, 2022(245):62-71.

[2] Awan M J , Khan R A , Nobanee H ,et al.A Recommendation Engine for Predicting Movie Ratings Using a Big Data Approach[J].Multidisciplinary Digital Publishing Institute, 2021, 1215(10):1-10.

[3] Hua T . Simulation of Time Dimension Feature Extraction Method for High Dimension and Large Data Stream[J]. Computer Simulation, 2021, 38(4):356-360.

[4] Li S , Wang Y , Zeng Y .The Standardization System of Water Conservancy Project Cost Management under the EPC General Contract Mode[J].IOP Conference Series: Earth and Environmental Science, 2021, 787(1):012118 (5pp).

[5] Che M .A Collaborative Sensing System for Farmland Water Conservancy Project Maintenance through Integrating Satellite, Aerial, and Ground Observations[J].Water, 2021, 13(2163):1-13.

[6] Meng J , Zhang J .Study on risk assessment of EPC water conservancy project based on entropy weight set pair analysis[J].IOP Conference Series Earth and Environmental Science, 2021, 804(2):022045.

[7] Ji L , Liu W .Study on the Ecological Restoration Effect of Bioengineering Technology After Water Conservancy Project Construction[J].Basic & clinical pharmacology & toxicology. 2021, 128(3):22-23.

[8] Choi T M , Chen Y .Circular supply chain management with large scale group decision making in the big data era: The macro-micro model[J].Technological Forecasting and Social Change, 2021, 169(8):1-110.

 


Tsuruta Institute of Medical Information Technology
Address:[502,5-47-6], Tsuyama, Tsukuba, Saitama, Japan TEL:008148-28809 fax:008148-28808 Japan,Email:jpciams@hotmail.com,2019-09-16